📍 Location: Basra
📆 Duration: Feb–May 2020
📊 Value: 308,437 USD
Supply and installation of electrical cables and protective concrete trays as part of a collaborative project with BP—aimed at enhancing the durability, safety, and operational performance of industrial power infrastructure. This initiative supported efficient energy flow, reduced maintenance risks, and contributed to long-term infrastructure resilience within BP’s operational facilities.