📍 Location: Basra
📆 Duration: Dec 2013 – Dec 2014
📊 Value: 5,498,000,000 IQD
This project was designed to enhance the capacity and stability of the electrical transmission network, ensuring a more efficient and reliable flow of electricity between the two critical stations. By implementing high-standard engineering practices and using durable, advanced materials, the project significantly improved the operational resilience of the power grid. The improved connectivity contributed to reducing load stress, minimizing outages, and maintaining uninterrupted energy supply across the serviced areas. This initiative played a crucial role in supporting the growing energy demands of both residential and industrial zones in the region, laying the groundwork for future development.
Cable Termination